The industrial belts covered so far mostly had orders arrive first and the supply chain grow around them: Dongguan ran on processing with supplied materials, Nantong had a fair that grew factories.
Chenghai runs the order backwards: it built the whole supply chain first, then waited for orders.
And its wait lasted almost twenty years.
1978: the first toy processing contract
Chenghai's toy industry starts with the county being a hometown of overseas Chinese.
In 1978 the Chenghai No. 2 Light Industry Crafts Factory signed the county's first toy processing-with-supplied-materials contract — the order came from a Hong Kong compatriot of Chenghai origin.
That is processing with supplied materials: the materials were the counterparty's, the samples were the counterparty's, and the selling was the counterparty's too; Chenghai supplied only people and a plant.
So Chenghai's first lesson was not "make a product" but "make it to someone else's requirements".
The 1980s: what grew was domestic-sales workshops
Processing with supplied materials did not turn into an export industry by itself.
What grew in the 1980s was household workshops, and they made for domestic sales.
In 1985 the local official wording was "the market is concentrated domestically".
So the earliest batch of Chenghai factories lived on domestic orders — not foreign trade.
This is completely different from Dongguan, where processing with supplied materials went straight to export: in Chenghai overseas Chinese capital made a start, and then local people did domestic sales on their own.
The 1990s: domestic profits pushed the chain down to half an hour
This is the most important stretch of Chenghai's story.
In the 1990s, Chenghai used the money earned on domestic sales to build up moulds, spray painting, printing and components.
By 1996, when the toy association was founded, the "half-hour supply chain" had taken shape — every process a toy needs could be found within half an hour's drive.
In figures:
| Stage | Scale |
|---|---|
| Injection moulding | 300,000 machines |
| Printing and packaging | more than 2,000 firms |
| Mould base | Dexin Mould Steel, 350,000 sets a year ("change the mould in the morning, trial-produce in the afternoon") |
| Mould precision | Gaodesi, 0.005 mm, 10 billion pieces a year |
| Local sourcing rate | 90% |
| Development cycle | 7 days |
So Chenghai's real capability is not "cheap", it is "fast" — change the mould in the morning, trial-produce in the afternoon; a new product in 3 days, development finished in 7.
The plastic city came in 1998, twenty years after the workshops
This is the most counter-intuitive number in the piece.
Chenghai's plastics city was built only in 1998.
And by 1995 Chenghai's toy exports were already USD 72 million.
In other words: the supply chain — the factories — ran first, and the market, the plastics city, caught up behind it.
For comparison:
| City | Sequence |
|---|---|
| Baigou | fair → market → factories raised by the market |
| Dongguan | orders → factories → supply chain |
| Chenghai | overseas Chinese processing with supplied materials → domestic-sales workshops → chain built in full → overseas buyers enter the factories in 1997 → real export |
"Elsewhere orders grow the supply chain; Chenghai built the chain first and waited for orders."
1997: overseas buyers walk straight into the factory
Exports really connected in 1997.
That year overseas buyers began placing orders directly in the factories — not through foreign trade companies; they came themselves.
Why did they come? Because the supporting chain here was the most complete and patterns could be changed the fastest.
So Chenghai's exports were not "opened"; they were "sought out".
Copying to IP: no single turning point, and not cleared to this day
This passage has to be clear, because it is where Chenghai is most often misread.
Many people assume that in some year Chenghai "completed its transformation and said goodbye to knock-offs".
There is no such year: it is a line of four stages, and the lawsuits are still running today.
| When | What happened |
|---|---|
| 2016 | Xinhua still described Chenghai as starting "from the earliest copying and counterfeit manufacturing" |
| 2017 | Xinhua.net wrote that it "moved to own design from the 1990s" |
| 1998 | took on the Pokémon agency (its first IP) |
| 2004 | built its own animation |
| 2006 | "Blazing Teens" |
| 2009 | Alpha Group listed (the "animation + IP" model worked) |
| 2026 | only then did the government work report write "No. 1 in the country for IP licensing volume" |
But the clean-up is not finished:
- In 2025 the People's Daily still wrote that "infringing and counterfeit products are mixed into the market";
- the enforcement caseload of a leading local company is "more than 10,000 cases a year";
- one judgment awarded RMB 5 million (including treble punitive damages).
So the accurate statement is: Chenghai has IP capability and it has IP problems, and the two exist at the same time.
A buyer who relaxes at "No. 1 in the country for IP licensing" will walk into a trap; a buyer who walks away at "knock-offs" will miss its real capacity.
What buyers should watch
The scale is real:
| Item | Figure |
|---|---|
| Toy output value | above RMB 50 billion (2026 government work report) |
| Above-scale toy output value | RMB 12.767 billion (more than 50% of the district's above-scale total) |
| Toy exports | RMB 9.772 billion (70.35% of the district's exports) |
| Firms and workers | 68,000 / 200,000 |
| Global position | one in every three plastic toys worldwide comes from Chenghai |
Two numbers need care.
① Above-scale industrial gross output is falling. In 2025 above-scale industrial gross output was RMB 34.01 billion, down 9.7%, and value added fell 7.1%. The district government page's "RMB 34 billion completed" is a total-volume figure and must not be read as growth.
② Three authoritative counts conflict.
| Source | Firms / workers |
|---|---|
| Nanfang Daily 2026 | 68,000 / 200,000 |
| People's Daily 2025 | more than 50,000 / more than 200,000 |
| Xinhua 2025 | about 60,000 / 300,000 |
The figures used here are the newest (68,000 / 200,000), but the counts are not consistent.
On certification the three markets differ:
| Market | Requirement |
|---|---|
| China | CCC (SAMR Announcement No. 18 of 2020, toys 2202) |
| European Union | EN 71 (Directive 2009/48/EC) |
| United States | ASTM F963-23 (mandatorily incorporated in 16 CFR 1250.2) + CPSIA |
No limit value is given here — none was verified against the official text.
Testing capacity is local: the National Toy Quality Inspection and Testing Center (Shantou) is a CNCA-designated CCC laboratory.
One test
Chenghai's use is "fast" — not "cheap", and not "clean".
- Need speed (mould changes, trial runs, samples in 3 days) ⇒ Chenghai is the strongest;
- Need clean IP ⇒ verify the licence documents yourself, not just the claim that a licence exists;
- Need compliant capacity ⇒ it has it, but that and "knock-offs" are two things inside the same industrial cluster.
"Elsewhere orders grow the supply chain; Chenghai built the chain first and waited for orders" — so it learned to make before it learned to sell, and to copy before it learned to create.