Request a Quote

NOVEL HOME GOODS · INSIGHTS

Total Cost of Importing from China

A quote is one line of twelve. This page puts the other eleven on the table and shows how to estimate each one. It also covers the three costs buyers forget and how to build a cost sheet you can defend. For the duty and clearance steps in detail, read import duties and customs.

What goes into landed cost?

Landed cost is the money that leaves your account before the goods sit in your warehouse, divided by the units that arrived.

Incoterms are the three-letter trade terms: FOB means the seller loads the goods on board at the named port; CIF means the seller also pays freight and insurance to the destination port.

Twelve lines, in the order the money leaves.

  1. Goods value. The FOB price times the quantity, plus tooling, sample fees and any setup you paid.
  2. Inland transport in China. Truck from the factory gate to the port named on the quote.
  3. Export declaration and local charges. Documents, inspection if any, and terminal handling at origin.
  4. Main freight. Sea or air, per container or per kilo.
  5. Cargo insurance. Cover from warehouse to warehouse, usually priced on the CIF value, the value with freight and insurance inside.
  6. Destination port charges. Terminal handling, documents, and the fees your port adds.
  7. Duty. The customs value multiplied by the rate for your HS code. The HS code is the product number customs uses.
  8. Import VAT (value added tax) or sales tax. Charged at the border by your country, on a base your tax authority sets.
  9. Customs broker fee. The broker is the licensed agent who files your import declaration. One entry, plus extras.
  10. Inland delivery. Port to your warehouse, per truck or per pallet.
  11. Bank charges. Your transfer fee, the correspondent bank's fee, and any charge for the currency.
  12. Currency loss. The gap between the rate you planned with and the rate you got.

A 13th line is real money too: the cost of the cash tied up while the goods travel. Put it in as interest, and it stops being invisible.

How do you estimate each line?

Estimate every line as a range, and write down who gave you the number and when it expires.

A line with no owner and no expiry date is a guess.

Which three costs do buyers forget?

Demurrage and detention, the broker's extra charges, and the cash tied up in import VAT.

How do you build your own cost sheet?

One sheet, one row per cost, two results: total landed cost and landed cost per unit.

Keep the sheet for the next order. The second container is where the estimates become knowledge.

When is the cheap quote actually cheaper?

When the two quotes use the same trade term, the same port, the same packaging and the same payment term, the difference is real.

Check seven things before you believe a price gap.

If one of the seven is different, the price gap is measuring that difference, not the product.

Do-this checklist

  1. Write the twelve cost lines before you ask for a second quote.
  2. Convert every quote to the same Incoterm and the same port.
  3. Ask each supplier for carton size and units per carton.
  4. Get the HS code and the duty rate in writing.
  5. Ask your tax adviser how import VAT is recovered and how long it takes.
  6. Ask the forwarder for a destination fee schedule and the free days.
  7. Ask for freight validity dates and re-check them before booking.
  8. Add the interest on the cash tied up from payment to warehouse.
  9. Add a buffer row, labelled as a buffer.
  10. Build the sheet with a source column and a date on every number.
  11. Run a worst case before you place the order.
  12. Compare landed cost per unit, not the first line.
  13. Keep the sheet and compare it with the real invoices after arrival.

Sources

For a quote or to source your products, contact our Yiwu sourcing team → Request a quote

Related Buying Guides

What We Believe

Get a quote for this configuration

← Back to Blog