Tap to zoom
Power Tools

12V Cordless Angle Grinder

MOQ: 50 pcs

FromUS$16.36

FOB · Yiwu Sourcing · Quantity-based pricing — request a quote for your volume

Exchange rates fluctuate — current price is for reference only. Contact us for the latest quote.

PriceFrom US$16.36
MOQ50 pcs
Lead TimeStandard 15 days · Custom 25–40 days
Packaging50 × 47 × 41.5 cm · 20 pcs/ctn · 0.098 m³
products.containerLoadLabelproducts.packingCustomNote
Certificate verificationon request
SABER / SASO · Saudi Arabiacertificate held by the manufacturer — we hold none and issue no declaration of conformity

12V cordless angle grinder with 18,500 RPM, packaged in a plastic box. Suitable for grinding, cutting metal and other tasks. This 12V cordless angle grinder is used for cutting and grinding tasks in workshops, garages, and on-site jobs. It also suits maintenance and repair work where a cordless tool is needed. Confirm the 12V compatibility with your existing battery system before ordering. This model is quoted FOB Yiwu with an MOQ of 50 pcs. Samples are available before mass production (usually within 7 days). Lead time is 15 days for standard production, 25–40 days for full customization and 3–7 days for in-stock items. Certification (CE / RoHS) on request; payment terms are full T/T prepayment. Warranty: one year for normal use; consumable parts excluded.

Partner factories screened by our QC team
OEM & Custom
FOB Yiwu
Can't find what you need? We'll source & customize it for you across China

Request a Quote

MOQ: 50 pcs · Quantity-based pricing — request a quote for your volume

Description

12V cordless angle grinder with 18,500 RPM, packaged in a plastic box. Suitable for grinding, cutting metal and other tasks. This 12V cordless angle grinder is used for cutting and grinding tasks in workshops, garages, and on-site jobs. It also suits maintenance and repair work where a cordless tool is needed. Confirm the 12V compatibility with your existing battery system before ordering. This model is quoted FOB Yiwu with an MOQ of 50 pcs. Samples are available before mass production (usually within 7 days). Lead time is 15 days for standard production, 25–40 days for full customization and 3–7 days for in-stock items. Certification (CE / RoHS) on request; payment terms are full T/T prepayment. Warranty: one year for normal use; consumable parts excluded.

Related Buying Guides

Request a QuoteWhatsApp