Request a Quote

NOVEL HOME GOODS · INSIGHTS

How to Request and Evaluate Samples from China

This page covers when to ask for a sample and what the sample fee pays for. It also covers the ten checks to run on the box. And it shows how to stop an approved sample from becoming a different product in the factory. If you are still choosing a supplier, start with the beginner guide.

When do you need a sample?

Every order needs a sample. The only difference is how you get it.

Three units are worth more than one. The difference between them shows how wide the factory's process is. One perfect unit and two rough ones tell you the line cannot repeat the good one.

If the supplier cannot ship one unit inside the lead time he quotes for the full order, the stock is not in stock.

What does the sample fee pay for?

The fee pays for work that has no other buyer.

Free samples come in one form: the cost moved somewhere you cannot see. Look at three places before you call a sample free.

Ask one question that sorts the fee out: which of the six items does this fee cover? A supplier who answers "just a fee" has not costed the work.

When the sample needs a new mould, the fee becomes the mould cost. Then the questions change to ownership, who pays for changes, and what happens to the mould if you stop ordering. That part is covered in the price guide.

What must you send before you ask for a sample?

Send a one-page specification, a packaging brief and a colour reference. A photo is not an instruction.

A sample made without this page is the supplier's product, not yours. When the sample arrives, you will compare it against nothing.

If the supplier's question list is shorter than your page, he will fill the gaps with his own defaults. Those defaults are the parts you did not think about.

How do you check a sample when it arrives?

Check ten things in the first hour, on a table, before you plug it in or fill it.

  1. Measure it. Length, width, height and wall thickness in mm, against the drawing.
  2. Weigh it. A kitchen scale is enough. Weight finds thinner material faster than your eyes.
  3. Check the material. Grade, thickness, smell and flexibility. A magnet tells steel from plastic-filled metal.
  4. Run the function. Fill it, load it, work it at the longest setting and the heaviest load you expect.
  5. Look at the colour in daylight. Office light hides a red-blue shift.
  6. Run a finger along the edges. Burrs, sharp corners, a visible weld line, paint missing inside a corner.
  7. Open the packaging. Box, label, manual, barcode, warnings. Check the language, not only the print quality.
  8. Check the marks. A certificate mark must have the right shape and size, and your market must allow it.
  9. Count the accessories. Screws, plugs, spare parts, tools. A missing screw in a sample is a missing screw in 2,000 units.
  10. Read the documents. Specification sheet, test report, carton drawing. No documents means you do not know what you approved.

Write each result as a number. "Wall 1.8 mm against 2.0 mm on the drawing" is a finding. "Feels thin" is an opinion, and the supplier can argue with an opinion.

When three units arrive, check all three. For the bulk order later, buyers use a sampling standard called ISO 2859-1. Its AQL (acceptance quality limit) is the defect rate a sampling plan is built around, and it sets how many pieces to check and how many defects to accept. Sampling is a decision rule, not a quality promise.

When you buy direct, both the sample and the bulk run are yours to check — no agent stands between the factory and you. You place the order, you take delivery, and your name sits on the contract as the buyer. The comparison between the sealed sample and the production batch is yours to run: same phone, same window, same ruler, three measurements, colour, accessories, edges — each result written as a number. If the batch does not match, refuse it before it ships and make the factory rework or remake it. A batch that has left the factory is a claim, not a refusal. Your file is the self-check record: the items checked, the number for each one, and who signed it.

Does an approved sample guarantee the production run?

No. An approved sample is a document, and it only works when the copy you approved stays in your hands.

Chinese law gives the sealed sample weight. The Civil Code says the parties to a sale by sample shall seal up the sample, and the goods delivered must match the sample and its description (Article 635). A sample that was never sealed is a photo with a story.

Three things break the link between sample and production.

Ask for a line sample before the bulk run starts. A line sample comes off the real production line, from the real material. It costs one more sample fee and it settles most arguments before they start.

When should you refuse a sample?

Refuse in three cases: the sample cannot do the job, it differs from your specification, or it is better than the factory can repeat.

A supplier who says "the sample is not important, the order is" has told you where his quality sits.

How do you get the sample fee back?

Put three fields on the PI: the fee, the order quantity that triggers the deduction, and the date the offer expires.

If the sample fee comes off the goods payment, write that into the PI, not only in the chat.

Do-this checklist

  1. Decide how you will get the sample this time: pay for one, or buy one unit from a small order.
  2. Ask for the fee, what it covers, and the deduction rule in one message.
  3. Send a one-page specification, a packaging brief and a colour reference.
  4. Ask for three units, not one.
  5. Measure size, weight and wall thickness with a tape and a scale.
  6. Check the colour in daylight and write the result as a number.
  7. Check the retail box, the label, the manual and the certificate marks.
  8. Photograph the sample from six angles, next to a ruler.
  9. Sign, seal and label one sample, and keep it: that copy is yours.
  10. Write the sealed sample date into the PI.
  11. Ask for a line sample before the bulk run starts.
  12. Put the fee, the threshold quantity and the expiry date on the PI.
  13. Compare the sample against the spec sheet line by line.

Sources

For a quote or to source your products, contact our Yiwu sourcing team → Request a quote

Related Buying Guides

What We Believe

Get a quote for this configuration

← Back to Blog